Network Specialist

Tech People 247
Carroll, IA

Job details;

Need Smart Hands / Network Field Engineers

Resources should have experience in rack & stack, cabling, WLC installations, fiber connectivity, and remote support coordination.

Primary Onsite Work

Stage equipment before cutover.

Install 2 Cisco 9800 WLCs per site.

Perform power/network cross-connects, including verifying switchport availability for WLC connections.

Install/connect required SFPs, fiber patch cords, and Ethernet patch cords as per site requirement.

Support remote team during cutover and validate installation.

Legacy Equipment Handling (40–50% sites)

Remove old WLCs, label, pack, and prepare for return shipment.

Deployment Scope

Initial pace: 1 site per day for small/medium sites; weekends for large sites.

Tools / Material Readiness

Engineers should have console cable, hotspot, label maker, rack screws, and be prepared with/verify required SFP modules, fiber patch cords, and Ethernet patch cords per site.

Additional Recruitment Note: Prefer engineers with network implementation / cabling / smart hands background who can handle both installation and physical connectivity verification.

// // //