Construction Scheduler & BIM Modeler

Mashburn Construction
Columbia, SC

The Construction Scheduler & BIM Modeler is a hybrid role responsible for integrating schedule development with model-based coordination to improve project predictability, sequencing, and execution. This position supports projects from preconstruction through closeout by combining Critical Path scheduling with BIM coordination, clash detection, and 4D planning.

This role works closely with Project Managers, Superintendents, Preconstruction, and trade partners to ensure projects are delivered on time, fully coordinated, and aligned with company standards for safety, quality, and accountability.


Essential Functions/Job Responsibilities:


To perform this job successfully, an individual must be able to perform each essential duty satisfactorily, with or without special accommodation.


Key Responsibilities


Scheduling (CPM / Project Controls)

  • Develop and maintain baseline CPM schedules during preconstruction
  • Build detailed construction schedules including phasing and sequencing
  • Identify critical path activities and long-lead procurement items
  • Lead schedule coordination meetings with internal teams and subcontractors
  • Provide bi-weekly or monthly schedule updates
  • Develop recovery schedules when delays occur
  • Perform time impact analysis when needed
  • Create executive-level schedule reporting dashboards
  • Support claims documentation related to schedule impacts


BIM Modeling & Coordination

  • Develop and maintain 3D BIM models for coordination and planning
  • Perform clash detection and facilitate trade coordination meetings
  • Integrate schedule into model for 4D sequencing visualization
  • Support quantity takeoffs and model-based estimating
  • Produce coordination drawings and assist with shop drawing review
  • Maintain BIM standards and naming conventions
  • Assist field teams with model access and real-time updates
  • Support as-built modeling and closeout documentation


Qualifications

  • Bachelor’s degree in construction management, Engineering, Architecture, or related field (preferred)
  • 3–5 years of commercial construction experience
  • Proficiency in:
  • Primavera P6 or Microsoft Project
  • Autodesk Revit
  • Strong understanding of construction sequencing and field operations
  • Ability to read and interpret plans and specifications
  • Experience with healthcare or complex commercial coordination preferred
  • Excellent communication and analytical skills


This job description outlines the primary and recurring responsibilities of this position. It is not intended to be an exhaustive list of all duties, responsibilities, or tasks that may be required. The individual in this role will regularly perform additional related assignments, special projects, and other duties as directed by company leadership, including the Director of Operations, Preconstruction Manager, and/or other designated supervisors.


South Carolina is an Employment-At-Will state. This job description does not constitute an employment agreement or contract. Management reserves the exclusive right to modify, revise, or update this job description at any time, with or without notice.